Acceptance criteria for vertical CNC machining centers

Date:2025-01-23    Click:1002


How to inspect CNC machining centers? The acceptance standards and methods for CNC machining center equipment may vary depending on the specific equipment type and requirements. The acceptance process is as follows:

1. Pre acceptance: The enterprise conducts a preliminary inspection of the CNC machining center after the final assembly of the CNC machining center manufacturer. The purpose is to check and verify whether the purchased machining center can meet the processing quality and production efficiency requirements of its own products, and whether the provided information, spare parts, etc. are complete.

2. Arrival acceptance: After the CNC machining center packaging box arrives at the installation site, the equipment management department promptly organizes relevant personnel to open the box for inspection, including equipment management personnel, technical personnel, user units, etc.

3. Installation process acceptance: Check the quality and accuracy of each component itself, as well as the geometric accuracy, positional accuracy, function, performance, etc. between each axis after installation adjustment.

4. Hardware acceptance: After the installation of the machining center is completed, the main purpose is to inspect the performance of the machining center, including running balance, hydraulic, lubrication, heating, noise, alarm prompts, current overload protection, and limit protection. At the same time, the geometric accuracy, position accuracy, and cutting accuracy of the machining center should also be inspected.

5. Software acceptance: After the hardware acceptance of the machining center is completed, the software part also needs to be accepted, in order to avoid having data to check, clear responsibilities, and handover of management data during later use and maintenance.

In addition to the above steps, the acceptance work of the CNC machining center also includes checking the accuracy of the equipment. After completing the above steps, it is necessary to confirm whether the CNC machining center meets the requirements proposed during pre acceptance and test its performance. If everything is normal, then the acceptance work is completed.

Product center

Content us

13728386957
Address: No. 2 Yiran Road, Songshan Lake Management Zone, Dongguan City, Guangdong Province
Email: liao@dgjuming.com
CopyRight © 2025 Guangdong Juming CNC Technology Co., Ltd.          Guangdong ICP No. 2025368497